Availability: | |
---|---|
Quantity: | |
SN-4000TL
SNOWBALL
8477.4010.00
Carrousel rotomoulding machine is common molding equipment and each arm’s working and technological circle(rotating speed,heating temperature and time,cooling) is independent from other arms.It is fit for making products with different materials,thickness,which is flexible and high efficiency.
This carrousel rotomolding machine oven can be moveable. Its shape is round. There is only one door, so it is energy-saving and popular.
Technical data sheet:
Model No. | Oven Size(mm) | Machine Dimensions(mm) | Total Power (kw) | Biggest tank made | ||
L | W | H | ||||
SN-2000ZC | Ø2000 | 10000 | 8000 | 3500 | 24.75 | 1000L |
SN-2500ZC | Ø2500 | 13500 | 9000 | 4000 | 35 | 2500L |
SN-3000ZC | Ø3000 | 15500 | 10500 | 4500 | 35 | 4500L |
SN-3500ZC | Ø3500 | 17500 | 11500 | 5100 | 45.95 | 7000L |
SN-4000ZC | Ø4000 | 19500 | 13500 | 5600 | 56.60 | 10000L |
SN-4500ZC | Ø4500 | 21500 | 15500 | 6100 | 62.60 | 14000L |
Machinery type: | Carrousel rotomolding machine |
Heating supply: | Natural gas,liquefied gas,diesel oil |
Temperature control: | DTE Control±2℃ |
Burner system: | Riello RS20/RS34/RS50/RS70/RS100/RS130 |
Cooling mode: | Fan cooling or water cooling |
Control mode: | Touch screen+PLC(Siemens brand) |
Electric brand: | Schneider,Omron |
Delivery time: | About 60 days after receive the deposit |
Overseas Installation period | It depends on machine size,usually takes 10-20days |
Heating rate: | 3 miniutes from room temperature to 280 degree in oven |
(1). Delivery time:
60 days after receiving the down payment.
(2). Payment term:
50% deposit,and 50% balance before shipment after inspection.
(3). Install and adjust (compensation):
All the exporting equipment are designed with module function, The buyer can install the
equipment with our installation instruction easier.
If the client insists to send the technician for machine installation, they will need to pay the
travel fee and accommodation fee, and labor cost USD 100 for one person in one day.
(4). Warrantee and after-sales service:
All equipment is offer one year warranty, For each driving motor, Inverter, Big arm and PLC, we offer warranty for 18 months.
Carrousel rotomoulding machine is common molding equipment and each arm’s working and technological circle(rotating speed,heating temperature and time,cooling) is independent from other arms.It is fit for making products with different materials,thickness,which is flexible and high efficiency.
This carrousel rotomolding machine oven can be moveable. Its shape is round. There is only one door, so it is energy-saving and popular.
Technical data sheet:
Model No. | Oven Size(mm) | Machine Dimensions(mm) | Total Power (kw) | Biggest tank made | ||
L | W | H | ||||
SN-2000ZC | Ø2000 | 10000 | 8000 | 3500 | 24.75 | 1000L |
SN-2500ZC | Ø2500 | 13500 | 9000 | 4000 | 35 | 2500L |
SN-3000ZC | Ø3000 | 15500 | 10500 | 4500 | 35 | 4500L |
SN-3500ZC | Ø3500 | 17500 | 11500 | 5100 | 45.95 | 7000L |
SN-4000ZC | Ø4000 | 19500 | 13500 | 5600 | 56.60 | 10000L |
SN-4500ZC | Ø4500 | 21500 | 15500 | 6100 | 62.60 | 14000L |
Machinery type: | Carrousel rotomolding machine |
Heating supply: | Natural gas,liquefied gas,diesel oil |
Temperature control: | DTE Control±2℃ |
Burner system: | Riello RS20/RS34/RS50/RS70/RS100/RS130 |
Cooling mode: | Fan cooling or water cooling |
Control mode: | Touch screen+PLC(Siemens brand) |
Electric brand: | Schneider,Omron |
Delivery time: | About 60 days after receive the deposit |
Overseas Installation period | It depends on machine size,usually takes 10-20days |
Heating rate: | 3 miniutes from room temperature to 280 degree in oven |
(1). Delivery time:
60 days after receiving the down payment.
(2). Payment term:
50% deposit,and 50% balance before shipment after inspection.
(3). Install and adjust (compensation):
All the exporting equipment are designed with module function, The buyer can install the
equipment with our installation instruction easier.
If the client insists to send the technician for machine installation, they will need to pay the
travel fee and accommodation fee, and labor cost USD 100 for one person in one day.
(4). Warrantee and after-sales service:
All equipment is offer one year warranty, For each driving motor, Inverter, Big arm and PLC, we offer warranty for 18 months.