The carousel apparatus is ideal for producing sizable items of various dimensions while maintaining a consistent yield. It can accommodate either three or four arms and is equipped with three to four stations (heating, cooling, loading). There are two entry points available. The furnace is secured to the ground.
Technical data sheet:
Model No. | Oven Size(mm) | Machine Dimensions(mm) | Total Power (kw) | Biggest tank made | ||
L | W | H | ||||
SN-4500TL | Ø4500 | 21500 | 15500 | 6100 | 62.60 | 14000L |
Machinery type: | Carrousel rotomolding machine |
Heating supply: | Natural gas,liquefied gas,diesel oil |
Temperature control: | DTE Control±2℃ |
Burner system: | Riello RS100 |
Cooling mode: | Fan cooling or water cooling |
Control mode: | Touch screen+PLC(Siemens brand) |
Electric brand: | Schneider,Omron |
Delivery time: | About 60 days after receive the deposit |
Overseas Installation period | It depends on machine size,usually takes 10-20days |
Heating rate: | 3 miniutes from room temperature to 280 degree in oven |
SNOWBALL Import and Export Co.,Ltd Profiles
Hangzhou Snowball Import and Export CO., LTD, is specialized in developing, manufacturing and exporting rotomolding machines, rotational mould as well as rotational molding products. For machine we have shuttle machine, carrousel machine, and rock and roll machine, For rotational mould we produce mould for water tank, fishing boat, buoys, outdoor furniture and fuel tanks. We also export various ranges of rotomolding product like cooler boxes, buoys, fishing boats, furniture, pallets, water tank and fuel tanks as well as other customized rotomolded product. Our manufacturing factory is with advanced production line, first grade of technical, high lever production team and comprehensive management system. Our insulated cooler box is of elegant design, superior insulation property, and wide range capacity like 25L, 35L, 50L, 65L, 80L, 110L and more. We also make production based on OEM and ODM.
Our SNOWBALL brand coolers also enjoy a great reputation in streamline design, holding ice long time and wide application in camping, fishing and party. We export our rotomolding machines, moulds and product to many different countries around the world, such as United State, UK, Australia, Korea, Japan and other countries and regions. Our slogan is "To be one-stop solution provider of rotational mould field ". Welcome to contact us, Rotate your business, Snowball your wealth.
FAQ
Q1:What is rotomolding process?
A:The rotational molding process is quite simple: A hollow mold is filled with powdered plastic resin. The mold begins rotating bi-axially and is transferred into an oven. The mold continues to rotate as the resin melts and coats the walls of the mold. The mold is cooled until the resin hardens into the desired shape.
Q2:What materials are used in rotational Moulding?
A: Rotomolding Materials Include:
Linear Low Density Polyethylene (LLDPE)
Medium Density Polyethylene (MDPE)
High Density Polyethylene (HDPE)
Low Density Polyethylene (LDPE)
Cross Link Polyethylene (XLPE)
EVA Co-polymer (EVA)
Polyvinylchloride (PVC)
Nylon.
Q3:How many types of rotational Moulding are there?
A:The types of rotational molding equipment are turret machines, shuttle machines, rock and roll machines, and open-flame machines.
Q4:Whats your companys' main products?
A:Our company is specialized in the rotational molding machines, moulds,Ice cooler box .
Q5. What is your delivery time?
A:Usually within 60 working days after sign contract and upon receipt of deposit TT transfer.
Q6. What is your payment terms?
A:50% deposit TT transfer after sign contract, and balance 50% after inspection before shipment.
Q7. How about your warrant and after-sale services?
A:All equipment unit are service one year warranty,
For electrical motor, Inverter, and PLC, we offer warranty for 18 months.
Q8. Do you test all your machine before delivery?
A: Yes, we test 100% of machine by our engineers before leave our company.
Q9. How to install and trial run when machine arrive customer's factory?
A: If the client insists to send the technician for machine installation, they will need to pay the travel fee and accommodation fee, and labor cost USD 100 for one person in one day.
Welcome to enquiry us! Rotate your business,Snowball your wealth!
Home Products Applications Services News About Us Contact Us