Availability: | |
---|---|
Quantity: | |
SN-4000TL
SNOWBALL
8477.4010.00
Characteristics of tower turning machine
The tower type rotary molding machine is recognized by customers for its continuous production and high stability.
The three-arm turret type rotary molding machine is equipped with a central turret, paired with 3 mobile cars. According to different product requirements, it can choose from 4 stations (heating, cooling, mold disassembly, preparation) and 5 stations (heating, pre-cooling, cooling, mold disassembly, preparation).
The four arm turret rotary molding machine is equipped with a central turret, paired with four mobile cars. According to different product requirements, it can choose from 5 stations (heating, cooling, mold disassembly, mold installation, preparation) and 6 stations (heating, pre-cooling, cooling, mold disassembly, mold installation, preparation).
The equipment control system use Siemens PLC, programmable, you can write as follows::
1, The speed of major (Shaft) axis of each arm (1-12 RPM)
2, The speed of minor (Disk) axis of each arm(1-16 RPM)
3, The maximum temperature and minimum temperature of each arm
4, The heating times of each arm need. (customized, could be individual control )
5, The cooling times of each arm need in cooling station
(customize, could be individual control)
6, The Mold inflatable time(customized, could be individual control)
Technical data sheet:
Model No. | Oven Size(mm) | Machine Dimensions(mm) | Total Power (kw) | Biggest tank made | ||
L | W | H | ||||
SN-2000TL | Ø2000 | 10000 | 8000 | 3500 | 24.75 | 1000L |
SN-2500TL | Ø2500 | 13500 | 9000 | 4000 | 35 | 2500L |
SN-3000TL | Ø3000 | 15500 | 10500 | 4500 | 35 | 4500L |
SN-3500TL | Ø3500 | 17500 | 11500 | 5100 | 45.95 | 7000L |
SN-4000TL | Ø4000 | 19500 | 13500 | 5600 | 56.60 | 10000L |
SN-4500TL | Ø4500 | 21500 | 15500 | 6100 | 62.60 | 14000L |
Machinery type: | Carrousel rotomolding machine |
Heating supply: | Natural gas,liquefied gas,diesel oil |
Temperature control: | DTE Control±2℃ |
Burner system: | Riello RS20/RS34/RS50/RS70/RS100/RS130 |
Cooling mode: | Fan cooling or water cooling |
Control mode: | Touch screen+PLC(Siemens brand) |
Electric brand: | Schneider,Omron |
Delivery time: | About 60 days after receive the deposit |
Overseas Installation period | It depends on machine size,usually takes 10-20days |
Heating rate: | 3 miniutes from room temperature to 280 degree in oven |
CE Certificate:
FAQ:
Q1. What is your company main products?
A:Our company is mainly producing rotational molding machine, mold and cooler box.
Q2. What is the MOQ for your production?
A:For rotomolded cooler,the MOQ is 50pcs;sample is available,only undertake sample cost and courier fee.We will return the sample cost when you place order.
Q3. What is your payment terms?
A:Machine&mold:50% deposit TT transfer after sign contract, and balance 50% after inspection before shipment.
Cooler box:30% deposit TT transfer and balance upon Bill of Lading copy.
Q4. What is your delivery date?
A:For machine, usually Within 60 working days upon receipt of deposit TT transfer.
For cooler box, within 20-30 working days for one 40HQ after receive deposit
Q5. Transportation
A:From Shanghai or Ningbo port by sea or by air
Q6. How about your after-sale services?
A:Machine Warranty:one year after installation and adjustment for trial in customer's workshop. We will assign two engineers to help customer assemble and trial run the machine.
Cooler box warranty: we will compensate a new one in your next order.
Q7. Do you test all your goods before delivery?
A: Yes, we test 100% of machine by our engineers before leave our company
Characteristics of tower turning machine
The tower type rotary molding machine is recognized by customers for its continuous production and high stability.
The three-arm turret type rotary molding machine is equipped with a central turret, paired with 3 mobile cars. According to different product requirements, it can choose from 4 stations (heating, cooling, mold disassembly, preparation) and 5 stations (heating, pre-cooling, cooling, mold disassembly, preparation).
The four arm turret rotary molding machine is equipped with a central turret, paired with four mobile cars. According to different product requirements, it can choose from 5 stations (heating, cooling, mold disassembly, mold installation, preparation) and 6 stations (heating, pre-cooling, cooling, mold disassembly, mold installation, preparation).
The equipment control system use Siemens PLC, programmable, you can write as follows::
1, The speed of major (Shaft) axis of each arm (1-12 RPM)
2, The speed of minor (Disk) axis of each arm(1-16 RPM)
3, The maximum temperature and minimum temperature of each arm
4, The heating times of each arm need. (customized, could be individual control )
5, The cooling times of each arm need in cooling station
(customize, could be individual control)
6, The Mold inflatable time(customized, could be individual control)
Technical data sheet:
Model No. | Oven Size(mm) | Machine Dimensions(mm) | Total Power (kw) | Biggest tank made | ||
L | W | H | ||||
SN-2000TL | Ø2000 | 10000 | 8000 | 3500 | 24.75 | 1000L |
SN-2500TL | Ø2500 | 13500 | 9000 | 4000 | 35 | 2500L |
SN-3000TL | Ø3000 | 15500 | 10500 | 4500 | 35 | 4500L |
SN-3500TL | Ø3500 | 17500 | 11500 | 5100 | 45.95 | 7000L |
SN-4000TL | Ø4000 | 19500 | 13500 | 5600 | 56.60 | 10000L |
SN-4500TL | Ø4500 | 21500 | 15500 | 6100 | 62.60 | 14000L |
Machinery type: | Carrousel rotomolding machine |
Heating supply: | Natural gas,liquefied gas,diesel oil |
Temperature control: | DTE Control±2℃ |
Burner system: | Riello RS20/RS34/RS50/RS70/RS100/RS130 |
Cooling mode: | Fan cooling or water cooling |
Control mode: | Touch screen+PLC(Siemens brand) |
Electric brand: | Schneider,Omron |
Delivery time: | About 60 days after receive the deposit |
Overseas Installation period | It depends on machine size,usually takes 10-20days |
Heating rate: | 3 miniutes from room temperature to 280 degree in oven |
CE Certificate:
FAQ:
Q1. What is your company main products?
A:Our company is mainly producing rotational molding machine, mold and cooler box.
Q2. What is the MOQ for your production?
A:For rotomolded cooler,the MOQ is 50pcs;sample is available,only undertake sample cost and courier fee.We will return the sample cost when you place order.
Q3. What is your payment terms?
A:Machine&mold:50% deposit TT transfer after sign contract, and balance 50% after inspection before shipment.
Cooler box:30% deposit TT transfer and balance upon Bill of Lading copy.
Q4. What is your delivery date?
A:For machine, usually Within 60 working days upon receipt of deposit TT transfer.
For cooler box, within 20-30 working days for one 40HQ after receive deposit
Q5. Transportation
A:From Shanghai or Ningbo port by sea or by air
Q6. How about your after-sale services?
A:Machine Warranty:one year after installation and adjustment for trial in customer's workshop. We will assign two engineers to help customer assemble and trial run the machine.
Cooler box warranty: we will compensate a new one in your next order.
Q7. Do you test all your goods before delivery?
A: Yes, we test 100% of machine by our engineers before leave our company